Skip Image Section Final/Parcel Map Transmittal Certification Home Government Departments and Divisions Community Development Development Engineering Final/Parcel Map Transmittal Certification Skip More in this Section More in this Section More in this Section Boundary Line Adjustments Submittal Requirements Development Engineering Standards (Plans and Specs)Rural Road Improvement Standards (RRIS) Development Engineering Handouts and Requirements Development Engineering Standard Notes Grading Plan Transmittal Certification Horizontal and Vertical Control Improvement Plan Transmittal Certification Reimbursement Policies for Privately Constructed Public Facilities Vacations (Abandonments) Skip Form Block Submit A New Final/Parcel Map Transmittal Certification Current Prepare Your Files Project and Engineer Information Document Checklist Signature Download Cover Sheet Upload Files Rename Your Files to Match the Following Titles Documents must be separate files Signed Stamped Transmittal Certification Final or Parcel Map Traverse Calculations Recorded Reference Maps of Surrounding Project Area Title Report with Schedule B Documents Project Billing Information Form Property Owner Letter of Authorization Required Fixed Fees Final Parcel Map (Residential): $7,000 Final Parcel Map (Commercial): $9,200 Final Subdivision Map: $7,000 + $70 per lot Start Your Project Submittal Leave this field blank Skip Form Block Content Rating Was this content useful? 👍 👎 Feedback How could we improve this content? (Optional) Send Feedback Leave this field blank