Left Content

Run 4 Hunger - https://elkgrove.gov/news/traffic-advisory-run-4-hunger

  • Street Name: Closing Allister Wy from Bridgewater Ct to W. Camden Dr, W. Camden Dr from Allister Wy to N. Camden Dr, N. Camden Dr from W. Camden Dr to Springhurst Dr, Springhurst Dr from N. Camden to Windspun St, and Goldy Glen Wy
  • Type of Work (Alternating/ Various/ Intermittent/ Mobile/ N/A): Street Use Permit
  • Starting Date: 7/4/2026
  • Ending Date: 7/4/2026
  • Time: 10:15am-11:00am
  • Department: Public Works
  • Division: ESD
  • Road Closure Project #: SUP26-0006

 

Block Party on Duovo Way

  • Street Name: Closing Duovo Wy from 9086 Duovo Wy to 9070 Duovo Wy
  • Type of Work (Alternating/ Various/ Intermittent/ Mobile/ N/A): Street Use Permit
  • Starting Date: 7/4/2026
  • Ending Date: 7/4/2026
  • Time: 5:30pm-11:30pm
  • Department: Public Works
  • Division: ESD
  • Road Closure Project #: SUP26-0011

 

Bilby Rd & Angsley Dr / Tilia Ave

  • AT: Bilby Rd & Angsley Dr / Tilia Ave
  • Direction: Various
  • Type of Work:  Various/intermittent
  • Starting Date: 3/5/26 (As Needed)
  • Ending Date: 6/30/26 (As Needed)
  • Time: 9am - 3pm (As Needed)
  • Department: Community Development
  • Division: Development Engineering
  • Lane Closure Project # Telos Greens TS (Traffic Signal Striping)

 

Big Horn Blvd & Bilby Rd

  • Between: Spoonwood Ave & Bilby Rd and Big Horn Blvd & Angsley Dr
  • Type of Work:  Various / Intermittent
  • Starting Date: 3/3/26
  • Ending Date: 6/30/26
  • Time: 9am - 3pm (As Needed)
  • Department: Community Development
  • Division: Development Engineering
  • Lane Closure Project # BILBY & BIG HORN BLVD BACKBONE IP_IPPB23-008(EG-10-060)

 

Bruceville Rd

  • Between: Chester Dawson & Bilby Rd
  • At: Boa Nova Dr / Elefa
  • Type of Work:  Alternating & Various
  • Starting Date: 5/12/26 As Needed for Project Utility & Trenching Work
  • Ending Date: 8/12/26
  • Time: 9am - 3pm (As Needed)
  • Department: Community Development
  • Division: Development Engineering
  • Lane Closure Project # Tuscan Ridge South IP_IPPB24-006(EG-15-038)

 

Bradshaw Rd

  • Between: Calvine Rd & Sheldon Rd
  • Type of Work:  Mobile (Cleaning)
  • Starting Date: 6/29/26
  • Ending Date: 7/3/26
  • Time: 9am - 3pm 
  • Department: Public Works
  • Division: Operations & Maintenance

 

Elk Grove Blvd

  • Between: 2nd St to Emerald Vista Drive
  • Direction: Westbound
  • Type of Work: Alternating
  • Starting Date:6/29/2026
  • Ending Date: 7/30/2026
  • Time: 9:00 PM to 5:00 AM
  • Department: Encroachments
  • Lane Closure Project # EP25-00057  

 

Elk Grove Blvd

  • Between: Big Horn Blvd & Bruceville Rd
  • Direction: Westbound
  • Type of Work: Various
  • Starting Date: 6/22/26 & 7/6/26
  • Ending Date: 7/23/26
  • Time: 8pm - 5am 
  • Department: Public Works
  • Division: Capital Maintenance
  • Lane Closure Project # 2025 Pavement Maintenance Project - Overlay (WPR025)

 

Elk Grove Blvd

  • Between: Waterman Rd & School St
  • Direction: Westbound & Eastbound
  • Type of Work:  (Alternating/ Various): one lane open through traffic and flagging, one each direction.
  • Starting Date: 05/26/26
  • Ending Date: 07/10/2026
  • Time: 8pm6am.
  • Performed by: PG&E/Teichert 3565206
  • Lane Closure Project # EP25-00248

 

Elk Grove Florin Rd

  • Between: Calvin Rd & Silverberry / Brown Rd
  • Direction: Southbound & Northbound
  • Type of Work: Various/Intermittent/Alternating Lane Shift / Closure - Two Way Traffic Control (As Needed For The Work)
  • Starting Date: 5/14/26
  • Ending Date: 10/14/26
  • Time: 9am - 3pm Monday - Friday As needed
  • Department: Community Development
  • Division: Development Engineering Contractor work potholing, Utilities and lane work
  • Lane Closure Project # Coral Blossom APTS_ROW Work_IPPV25-010(PLNG24-001)

 

Laguna Blvd

  • Between: Bruceville Rd & W Stockton Blvd
  • Direction: Eastbound & Westbound
  • Type of Work: Various
  • Starting Date: 6/15/26
  • Ending Date: 7/20/26
  • Time: 8pm - 5am 
  • Department: Public Works
  • Division: Capital Maintenance
  • Lane Closure Project # 2025 Pavement Maintenance Project - Overlay (WPR025)

 

Laguna Blvd

  • Between: Auto Center Dr & W Stockton Blvd
  • Direction: Northbound & Southbound
  • Type of Work: Various
  • Starting Date: 7/12/26
  • Ending Date: 7/27/26
  • Time: 8pm - 5am 
  • Department: Public Works
  • Division: Capital Maintenance
  • Lane Closure Project # 2025 Pavement Maintenance Project - Overlay (WPR025)

 

Wayne Heintz St to Wyland Dr

  • Between: Traveler Ct to Wyland Dr & Wayne Heintz St to Broxton Ave
  • Direction: Variable
  • Type of Work: Utility (Underground)
  • Starting Date: 06/15/2026  
  • Ending Date: 8/15/2026
  • Time: 9:00am to 3:00pm  (Monday - Friday)
  • Department: Community Development
  • Division: Development Engineering Project Utility installs & Grading
  • Lane Closure Project # Milestone II - IPPB 24-007(PLNG24-008)

 

Waterman Rd

  • Between: Charolais Way & Wayne Heintz St
  • Direction (N/B W/B S/B E/B): Northbound and Southbound
  • Type of Work (Alternating/ Various/ Intermittent/ Mobile/ N/A): Intermittent / Alternating / Various
  • Starting Date: 04/12/2026  
  • Ending Date: 10/12/2026
  • Time: 9:00pm to 5:00am  (As Needed)
  • Department: Community Development
  • Division: Dev Eng_Reg: Contractor Utility Work, K Rail Placement & Widening
  • Lane Closure Project # M2 Waterman RV Storage Offiste IP_IPPV25-005(PLNG23-018)

 

Whitelock Pkwy & Big Horn Blvd

  • Between: Caranita dr & Big Horn Blvd (EB) and Whitelock Pkwy & Spoonwood Ave (SB)
  • At: Corner of Whitelock Pkwy and Big Horn Blvd
  • Direction: Eastbound & Southbound
  • Type of Work:  Various/intermittent 
  • Starting Date: 3/5/26
  • Ending Date: 7/3/26
  • Time: 9am - 3pm (nights as needed) 7pm - 6am
  • Department: Community Development
  • Division: Development Engineering
  • Lane Closure Project # ELK GROVE SELF STORAGE_IPPV24-009(PLNG21-053)

Whitelock Pkwy & Lousada Dr

  • Starting Date: 04/27/2026 (As Needed)
  • Ending Date: 07/31/2026 (As Needed)
  • Department: Community Development
  • Division: Dev Eng_Reg: Project Work - "New Traffic Signal Installations"
  • Lane Closure Project # Whitelock Pkwy & Lousada Dr Traffic Signal

Bradshaw Rd

  • Between: Grant Line Rd to Calvine Rd
  • Type of Work: Mobile Ditch Cleaning
  • Starting Date: 06/1/2026
  • Time: 9AM- 3:30PM
  • Department: Public Works
  • Division: Operation and maintenance 

 

Big Horn Blvd & Kyler Rd

  • At: Big Horn & Kyler Rd (Ruthburg)
  • Type of Work (Alternating/ Various/ Intermittent/ Mobile/ N/A): Intermittent / Alternating
  • Starting Date: 04/30/2026 (As Needed)
  • Ending Date: 07/31/2026 (As Needed)
  • Department: Community Development
  • Division: DEV ENG REG Project Work - upgrade Existing "Signal Arbor Ranch 1"
  • Lane Closure Project # Ruthburg/Kyler & Big Horn TS Mods

 

Grant Line Rd & Waterman Rd

  • AT: Grant Line Rd & Waterman Rd
  • Type of Work (Alternating/ Various/ Intermittent/ Mobile/ N/A): Intermittent / Alternating
  • Starting Date: 04/27/2026 (As Needed)
  • Ending Date: 07/31/2026 (As Needed)
  • Department: Community Development
  • Division: DEV ENG REG Project Work - "Concrete and Asphalt Improvements"
  • Lane Closure Project # Waterman Rd Extension / Kubota

 

Right Content

Sign up for Road Closure Updates

By submitting this form, you are consenting to receive communications from: The City of Elk Grove, 8401 Laguna Palms Way, Elk Grove, CA, 95758, US, https://elkgrove.gov. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact.

Disclaimer: The City of Elk Grove Public Works Department provides this information as a service to the general public. While we attempt to provide accurate and timely information, estimates of the nature and duration of any particular road closure or other event are subject to such variables as weather, road conditions, and traffic conditions that are beyond the control of the City of Elk Grove and difficult to predict. Those relying on this information should do so at their own risk, and neither the City of Elk Grove nor any of its employees or agents shall be liable for either the accuracy of this information nor any actions taken as a result.