January
- 2019-012 Authorizing the Mayor to Execute an Employment Agreement with Jason Behrmann as the City Manager
- 2019-011 Authorizing City Manager to Make Best Interest Findings and Award Contracts for the Procurement of Commodities, Furniture, Fixtures, and Equipment
- 2019-010 Accepting the Bradshaw/Sheldon Road Intersection Improvements Project as Complete
- 2019-009 Accepting the Waterman Road Pavement Rehabilitation and Bike Lanes Project as Complete
- 2019-008 Authorizing City Manager to Execute a Contract for Professional Engineering Services with Mark Thomas and Company for the Laguna Creek Trail and Bruceville Road Safe Routes to School Improvements Project
- 2019-007 Approving Final Map for Subdivision Fieldstone North Village 6
- 2019-006 Approving Final Map for Subdivision Fieldstone North Village 4
- 2019-005 Authorizing City Manager to Execute Contracts with Multiple Vendors for the Procurement of Furniture, Fixtures, and Equipment for the Aquatics Center and Civic Center Commons Site Project
- 2019-004 Authorizing City Manager to Execute the Second Amendment to the Contract with Roebbelen Construction Management Services for Services related to the Aquatics/Commons and Community Center Projects
- 2019-003 Accepting the Emerald Vista Storm Drain Improvements Project as Complete
- 2019-002 Authorizing City Manager to Execute a Construction Contract with Reyre Construction for the Sacramento County Water Agency (SCWA) Frontage Improvement Project
- 2019-001 Finding the Elk Grove Florin Road at Elk Grove Park Sidewalk Infill Project Exempt from CEQA
February
- 2019-039 Finding No Further Environmental Review is Required and Adopting the Park Design Principles
- 2019-038 Finding No Further Environmental Review is Required for the Transportation Analysis Guidelines and Adopting the Transportation Analysis Guidelines
- 2019-037 Finding No Further Environmental Review is Required for the Climate Action Plan Update and Adopting the Updated 2019 Climate Action Plan
- 2019-036 Adopting The General Plan
- 2019-035 Certifying the EIR for the General Plan and Adopting Findings of Fact and Statement of Overriding Considerations and an MMRP
- 2019-034 Approving an Amendment to the Elk Grove Auto Mall Special Planning Area Conditions of Approval
- 2019-033 Authorizing City Manager to Execute Contracts and Necessary Agreements for a Three Year Agreement with Data Management and Superion for Implementing Timeclock Plus Software
- 2019-032 Adopting the Updated Americans with Disabilities Act, Title II, Self-Evaluation and Transition Plan
- 2019-031 Authorizing City Manager to Execute a Contract with Westervelt Ecological Services for Wetland Mitigation for The SEPA Shed C Channel Row and Permitting Project
- 2019-030 Authorizing City Manager to Execute a Construction Contract with Escobedo Concrete & Demolition for the Installation, Maintenance and Repair of Curbs, Gutters, Sidewalks and Related Items
- 2019-029 Accepting the Special Waste Collection Center Maintenance Aerosol Can Crusher and New Exhaust Fans Project as Complete
- 2019-028 Authorizing City Manager to Execute an Agreement for Maintenance of Joint Transportation Facilities with County of Sacramento
- 2019-027 Authorizing City Manager to Execute Amendment No. 1 to the Contract with Bryce Consulting to Provide Human Resource Services
- 2019-026 Authorizing a MOU with WEAVE for the Purpose of Applying for a Grant from the U.S. Department of Justice for a Domestic Violence Response Team
- 2019-025 Amending the Fiscal Year 2018-19 Budget and Fiscal Years 2019-23 Capital Improvement Program and Position Classification Plan
- 2019-024 Adopting and Levying a Fee for Park and Trail Improvements in the Southeast Policy Area Strategic Plan
- 2019-023 Adopting and Levying a Fee for Drainage Improvements in the Southeast Policy Area Strategic Plan and The Phase 3 Area of Laguna Ridge
- 2019-022 Adopting and Levying a Cost Recovery Fee for the Southeast Policy Area Strategic Plan
- 2019-021 Approving a Determination of Public Convenience or Necessity for A Type 21 License for Beer, Wine and Distilled Spirit Sales for The Circle K Fuel Center/Sheldon Place Center at the Southwest Corner of Sheldon Road and East Stockton Blvd.
- 2019-020 Authorizing City Manager to Execute the First Amendment to Contract with Professional Landscape Solutions for Landscaping Services of City Facilities
- 2019-019 Authorizing City Manager to Execute a Construction a Contract with Triamid Construction for City Hall Reception Desk and Clerk's Office Remodel and 8401 Laguna Palms Remodel Projects
- 2019-018 Directing Staff to Develop Alternative "C' Localized Two Way Left Turn Lanes for Sheldon Road from Elk Grove Florin Road To Waterman Road as a Proposed Project
- 2019-017 Authorizing City Manager to Execute a Construction Contract with Signal Perfection for the Real Time Information Center Phase 2 Project
- 2019-016 Authorizing City Manager to Execute a Construction Contract with Tim Paxin's Pacific Excavation for the Bruceville Road At Poppy Ridge Road/Quail Run Lane Intersection Signalization Project
- 2019-015 Approving the Vacation of a Public Utility Easement Over the Elk Grove Village Shopping Center Located at 8945 Elk Grove Blvd
- 2019-014 Authorizing City Manager to Execute the First Amendment to the Contract with Hunting Environmental to Provide Biological Services
- 2019-013 Authorizing City Manager to Execute the First Amendment to the Contract with Willdan Engineering for Development Services Department
March
- 2019-059 Approving The Animal Care Center Artwork Selected by the Review Panel and Authorizing the City Manager to Execute Contracts with the Respective Artists
- 2019-058 Adopting Amendment #1 to the CDBG 2018-19 Action Plan
- 2019-057 Finding No Further Environmental Review is Required Pursuant to State CEQA Guidelines Sections 15183 and Approving Tentative Parcel Map for The Pleasant Grove School Road Map Project
- 2019-056 Authorizing City Manager to Apply for Fiscal Year 2018-19 Low Carbon Transit Operations Program (LCTOP) Funds for the Construction of Electric Infrastructure that would support a Zero Emission Bus Fleet
- 2019-055 Authorizing City Manager to Execute Two Professional Services Contract Amendments/Extensions with Willdan Engineering to Provide Public Works Services
- 2019-054 Authorizing City Manager Execute a Professional Services Contract with Foothill Associates to Complete the Design and Prepare BID Documents for the Civic Center Nature Area Project
- 2019-053 Accepting the Pedestrian Crossing Upgrades at Three Locations Project as Complete
- 2019-052 Accepting the Real Time Information Center Phase I Project as Complete
- 2019-051 Accepting the SWCC Unloading Area Improvements and SWCC Maintenance Loading Dock Area Improvements Projects as Complete
- 2019-050 Authorizing City Manager to Accept Domestic Cannabis Eradication/Suppression Program (DDESP) Grant Funding from The US Department of Justice Drug Enforcement Initiative for Marijuana Eradication
- 2019-049 Authorizing City Manager to Execute a Second Amendment with Galls for Ballistic Vests
- 2019-048 Authorizing City Manager to Execute Third Amendment with Bong Goo Lee Corporation for Dry Cleaning Services for Police Uniforms
- 2019-047 Repealing the East Franklin Specific Plan
- 2019-046 Repealing the East Elk Grove Specific Plan
- 2019-045 Authorizing City Manager to Execute Contract with Sacramento Regional Transit District to Provide the City's Fixed Route Local and Commuter Transit Services, ADA Paratransit Services and Supporting Transit Maintenance Operations
- 2019-044 Affirming the City of Elk Grove's Commitment to Helping the State of California and the SACOG Region Reach its 19 Percent Greenhouse Gas Reduction Goal through implantation of the Green Means Go Pilot Project
- 2019-043 Authorizing City Manager to Execute Contract for On Call Traffic Engineering and Transportation Engineering Professional Services with Five Firms
- 2019-042 Accepting the Southeast Policy Area Sewer Lift Station and Infrastructure Project as Complete
- 2019-041 Authorizing City Manager to Execute Construction Contract with Mozingo Construction for North Camden Drive Storm Drain Improvements & Blakemore Court and Hartwell Court Drainage Improvements Projects
- 2019-040 Authorizing City Manager to Execute Contract to purchase Two Compressed Natural Gas Transit Cutaway Buses with Creative Bus Sales through a Cooperative Purchasing Agreement
April
- 2019-083 Amending the Fund Balance Reserve Policy
- 2019-082 Adopting the Mission, Vision, Goals and Priority Projects for Fiscal Years 2019-2020 and 2020-2021
- 2019-081 Approving Tentative Parcel Map for the Kitenza Map Project
- 2019-080 Authorizing City Manager to Execute a Consultant Contract with Dahlin Group to Complete the Elk Grove Design Guidelines Comprehensive Update
- 2019-079 Approving the Proposed Reclassification of one Administrative Assistant Position to Administrative Analyst I in the City Manager's Office
- 2019-078 Authorizing City Manager to Execute First Amendment to the Current Contract with WarriorZ Health and Fitness for Employee Wellness Program
- 2019-077 Authorizing City Manager to Execute Use Agreements for the Elk Grove Aquatics Center with the Consumnes River Aquatics Club and Elk Grove Swim Team Boosters for a term of one year
- 2019-076 Authorizing City Manager to Execute a Contract with Elk Grove Auto Group for the Purchase of Three Light-Duty Pickup Trucks for Public Works Operation and Maintenance
- 2019-075 Accepting the LED Replacement Lamp Upgrade Project as Complete
- 2019-074 Authorizing City Manager to Execute a Purchase and Sale Agreement and Joint Escrow Instructions Including all associated documents necessary to complete the purchase of property located at 9108 Elk Grove Blvd
- 2019-073 Authorizing City Manager to Execute Third Amendment to Fixed Route, ADA Paratransit/Dial-A-Ride, and Maintenance Operations Contract with MV Transportation
- 2019-072 Authorizing City Manager to Execute a Construction Contract with Arrow Construction for the Installation, Maintenance and Repair of Asphalt Concrete, Roadways, Alleys, Speed Humps and Related Items Project
- 2019-071 Authorizing City Manager to Execute a Construction Contract with B&M Builders for the Elk Grove and Laguna Blvd UPRR Xing Interim Bike Lane Improvements Project
- 2019-070 Authorizing City Manager to Execute a Fifth Amendment to Contract with Redflex Traffic Systems for Red Light Camera Enforcement
- 2019-069 Authorizing City Manager to Execute an Amendment to the Contract with Jones Hall to Provide Disclosure Counsel Services
- 2019-068 Authorizing Finance Director to Sell or Otherwise Dispose of Surplus City Property in the Form of Law Enforcement Vehicles, A City Vehicle, Law Enforcement Equipment and Transit Vehicles
- 2019-067 Approving the 2019 Laguna Ridge Specific Plan Supplemental Park Fee Program Nexus Study Update and Establishing Laguna Ridge Specific Plan Supplemental Park Fee Program Fees
- 2019-066 Approving the 2019 Laguna Ridge Park Fee Program Nexus Study Update and Establishing Laguna Ridge Park Fee Program Fees
- 2019-065 Authorizing City Manager to Execute a One Year Extension to the Nonexclusive Limited License Agreement with Elk Grove American Legion Post 233 For Storage Purposes at 10251 Grant Line Road
- 2019-064 Identifying the 2019 Pavement Slurry Seal & Resurfacing Project, 2020 Pavement Slurry Seal & Resurfacing Project, Bond Road Median Improvements & Resurfacing Project, and Asphalt Repairs in Preparation of WPR019, WPR020 and WTC015 Projects as Receiving Funding from the Road Maintenance and Rehabilitation Account for Fiscal Year 2019-20
- 2019-063 Adopting Revised Speed Control Program Guidelines
- 2019-062 Adopting the 2019-2020 Legislative Principles & Procedures
- 2019-061 Authorizing City Manager to Execute the Third Amendment to the Contract with KP Research Services for Peace Officer Standards and Training (Post) Pre-Employment Background Investigations
- 2019-060 Authorizing City Manager to Accept an Appropriation from the State Supplemental Law Enforcement Services Fun
May
- 2019-102 Providing for the Levy of the Special Taxes or Assessments for the Fiscal Year 2019-20 and Directing the Director of Finance to File Lists of Parcels Subject to the Special Taxes or Assessments, Including the Amount of the Taxes or Assessments to be Levied on Each Parcel, with the County Auditor (City of Elk Grove Community Facilities, Maintenance, Services and Special Districts)
- 2019-101 Amending Certain Nexus Study Maps for the SEPA Park and Trail Fee Program and the SEPA and LRSP Phase 3 Drainage Fee Program
- 2019-100 Finding no Further Environmental Review is Required Under the CEQA Pursuant to State CEQA Guidelines Section 15162 and Approving Amendments to the COA's for the Approved Ermandarold Estates Project
- 2019-099 Amending the City of Elk Grove Land Secured Financing Policy to Allow for the Use of the Bond Opportunities for Land Development Program Through the CMFA
- 2019-098 Authorizing City Manager to Execute Contracts with Multiple Vendors for the Procurement of Furniture, Fixtures, and Equipment for Civic Center - Community and Senior Center
- 2019-097 Amending the 2018-23 CIP Project Description for the Elk Grove and Laguna Blvds UPRR XING Interim Bike Land Improvements Project
- 2019-096 Authorizing City Manager to Execute a Contract with Solutions for Transit for GFI Reporting Services
- 2019-095 Authorizing City Manager to Execute a Credit Reimbursement Agreement with Taylor Morrison for Privately Constructed Public Facilities required as a condition of approval for the Final Map for Subdivision Madeira East Village 8
- 2019-094 Authorizing City Manager to Execute an Amendment to Master Agreement with Ray A. Morgan Company for the Lease and Maintenance of Multi-Function Printers and Maintenance of Wide Format and Laser Printers
- 2019-093 Adoption the 2019-20 Action Plan and Authorizing City Manager to Execute and File all Documents required to Receive U.S. Department of Housing and Urban Development HUD Community Development Block Grant CDBG Funding
- 2019-092 Authorizing the Addition of Four Full-Time Police Officer Positions
- 2019-091 Declaring Its Intention to Levy and Collect Service Charges for the Laguna West Service Area for FY 2019-20
- 2019-090 Approving the Annual Report for the Laguna West Service Area for FY 2019-20
- 2019-089 Initiating Proceedings for the Levy and Collection of Service Charges for the Laguna West Service Area for FY 2019-20
- 2019-088 Approving the Final Map for Fieldstone North Village 7
- 2019-087 Approving the Final Map for Fieldstone North Village 1
- 2019-086 Accepting the Citywide Curb Ramps 2018 Project as Complete
- 2019-085 Accepting the Sidewalk Infill Project 2018 (East Stockton Blvd & Laguna Blvd) as Complete
- 2019-084 Amending Fiscal Year 2018-119 Budget and 2018-23 Capital Improvement Program for the Railroad Street Improvements Project
June
- 2019-137 Designating Cosumnes Community Services District Fire Department Staff as Code Enforcement Officers in the City of Elk Grove for Purposes of Enforcement of Chapter 17.06 (Fireworks Violations)
- 2019-136 Updating the Schedule of Fines related to Administrative Citations in the City of Elk Grove
- 2019-135 Adopting the Adoption Fee Schedule for Elk Grove Animal Shelter
- 2019-134 Approving and Confirming Report of Delinquent Sidewalk Repair and Nuisance Abatement Costs - Special Assessment
- 2019-133 Approving a Major Design Review Amendment and Conditional Use Permit for the Calvine Pointe
- 2019-132 Finding no Further Environmental Review is Required Pursuant to State CEQA Guidelines Sections 15183 and Approving The Tentative Parcel Map for The Tankersley Parcel Map Project
- 2019-131 Authorizing City Manager to Execute an Economic Development Agreement with the Greater Sacramento Economic Council for Fiscal Year 2019-20
- 2019-130 Ratifying the Memorandum of Understanding between the City of Elk Grove and the Elk Grove Police Officers Association
- 2019-129 Authorizing City Manager to Execute a Third Amendment with Clean Harbors Environmental Services
- 2019-128 Authorizing City Manager to Execute a Construction Contract with Arizona Continental Flooring for The Facility Flooring Finishes Replacements Projects
- 2019-127 Authorizing City Manager to Execute a Construction Contract with FBD Vanguard for The 2019-2020 Citywide Curb Ramp Improvements Project Phase 1
- 2019-126 Authorizing City Engineer to Reject All Bids Received for the City Hall Building Water Infiltration Project and Directing the City Engineer to Re-Bid the Project
- 2019-125 Authorizing City Manager to Execute Master Services Contracts with Interwest; Kjeldsen Sinnock Neudeck; Coastland Civil Engineering; and Ponticello Enterprises for On Call Project Management Services
- 2019-124 Authorizing City Manager to Execute a Construction Contract with American Pavement Systems for The 2019 Pavement Slurry Seal and Resurfacing Project
- 2019-123 Authorizing City Manager to Execute Amendment #4 with VCA Animal Hospitals for Veterinary Services
- 2019-122 Authorizing City Manager to Enter into an Agreement with the County of Sacramento to Provide Animal Sheltering though the Department of Animal Care and Regulations
- 2019-121 Authorizing City Manager to Execute an Agreement with D-Tac K9 for Police Canine Training Services
- 2019-120 Authorizing City Manager to Execute a Contract with Granicus for Streaming Media Services
- 2019-119 Establishing a Revised Policy for the Retention of Records Maintained by the Development Services and Public Works Departments
- 2019-118 Authorizing City Manager to Execute an Amendment to the Master Agreement for Consulting Services with Sjoberg Evashenk for Internal Audit Services
- 2019-117 Authorizing City Manager to Execute a Construction Contract with Central Valley Engineering & Asphalt for the Asphalt Concrete Repairs in Preparation for WPR019
- 2019-116 Approving the Civic Center Commons Music Sculpture by The Review Panel
- 2019-115 Updating User Fees for the Elk Grove Aquatic Center
- 2019-114 Confirming the Laguna West Service Area Annual Report of Fiscal Year 2019-20 Service Charges and Ordering the Levy for the Laguna West Service Area (Formerly County Service Area No. 5) for Fiscal Year 2019-20
- 2019-113 Adopting the Fiscal Year 2019-20 Budget, The Fiscal Year 2019-20 through Fiscal Year 2023-24 Capital Improvement Program
- 2019-112 Finding no Further Environmental Review is Required Pursuant to State CEQA Guidelines Sections 15183 and Approving a Conditional Use Permit Amendment and Design Review Amendment for the Landing Assisted Living Project
- 2019-111 Requesting a Functional Classification Change for Local Streets and Roads by the State of California, Department of Transportation
- 2019-110 Authorizing City Manager to Execute a Second Amendment for the Sale of Goods and Services with Bagley Enterprises
- 2019-109 Authorizing City Manager to Execute an Acquisition Agreement with Taylor Morrison for CFD 2005-1 Laguna Ridge from the Series 2018 Bonds
- 2019-108 Authorizing City Manager to Execute a Credit Reimbursement Agreement for Quimby Park Land with Elk Grove Independent Living for Private Land
- 2019-107 Authorizing City Manager to Execute an Amendment to the Civic Center Art Management Contract to Include the Civic Center Nature Area Artwork
- 2019-106 Authorizing City Manager to Execute a Contract with Ascent Environmental for the Old Town Special Planning Area Update
- 2019-105 Authorizing City Manager to Execute a Contract with Ascent Environmental for the City of Elk Grove Community/Mobility Resilience Plan
- 2019-104 Authorizing City Manager to Execute a Contract with George Hills to Provide General Liability Claim Adjusting and Administration Services
- 2019-103 Adopting the Fiscal Year 2019-20 Investment Policy
July
- 2019-164 Authorizing City Manager to Execute and Economic Incentive Agreement with SensorTransport
- 2019-163 Authorizing City Manager to Execute and Economic Incentive Agreement with Innogrove
- 2019-162 Setting Fees to be Collected from Small Quantity Generators of Hazardous Waste to Cover the Cost of Handlin and Disposing Hazardous Waste at the Special Waste Collection Center
- 2019-161 Approving and Confirming the Report of Delinquent Solid Waste and Storm Drain Utility Charges Prepared by Republic Services
- 2019-160 Approving the Supplemental MND and Adopting the MMRP for the Railroad Street Improvements Project
- 2019-159 Authorizing City Manager to Execute the First Amendment with Elite Maintenance Management Systems for Custodial Services
- 2019-158 Authorizing City Manager to Execute an Agreement with EGUSD to Provide Temporary and Part-Time Services from Uniformed EGPD Officers Working Overtime
- 2019-157 Authorizing City Manager to Execute a Contract with ELS Architecture and Urban Design for the Civic Center North Property Site Planning and Feasibility Analysis Project
- 2019-156 Amending the Fiscal Year 2019-2020 Budget and 2019-2020 Capital Improvement Program
- 2019-155 Authorizing City Manager to Execute a Construction Contract with Sierra Asphalt for The Bond Road Pavement Rehabilitation Project
- 2019-154 Accepting the Big Horn Blvd Los Rios College Driveway to Bilby Road and Bilby Road Improvements Bruceville Road to Shed C Channel Projects as Complete
- 2019-153 Authorizing City Manager to Execute an Agreement between the City of Sacramento and the City of Elk Grove for the Franklin Blvd Cycle Track Phase 1 Project
- 2019-152 Dissolving the City of Elk Grove Multicultural Committee and Establishing The Diversity and Inclusion Commission
- 2019-151 Amending and Adopting the Employee Salary Ranges and Approving One Additional Employee Holiday
- 2019-150 Granting a Non-Exclusive Easement to SMUD and PG&E over a City-Owned Parcel to Serve Fieldstone North
- 2019-149 Authorizing Application for and Receipt of Senate Bill 2 Planning Grants Program Funds
- 2019-148 Authorizing City Manager to Execute a Contract with Elk Grove Ford for the Purchase of replacement police vehicles
- 2019-147 Authorizing and Agreement with EGUSD for Two EGPD Officers Assigned as School Resource Officers
- 2019-146 Authorizing City Manager to Execute the Second Amendment to the Bus Rapid Transit Early Implementation Study Contract with Iteris
- 2019-145 Approving the Senate Bill 1 State of Good Repair Project List for the FY 2018-19 Funding Allocation
- 2019-144 Authorizing City Manager to Execute a Contract with OpenCounter Enterprises for Hosting and Maintenance of an Online Portal for Zoning and Business Permitting and Fee Information
- 2019-143 Authorizing City Manager to Enter Into a MOU and Cooperative Agreement with The Capital Region Small Business Development Center to Continue the South Sacramento County Small Business Development Center at Elk Grove City Hall
- 2019-142 Amending the Startup Elk Grove Incentive Program Policies, Guidelines, and Procedures and Authorizing the City Manager to Take all Actions Necessary to Implement and Administer the Program
- 2019-141 Declaring Its Intention to Annex Territory to Strom Water Drainage Fee Zone 2 (Annexation 28) and To Levy Storm Water Drainage Assessments
- 2019-140 Declaring its Intention to Annex Territory to CFD 2006-1 Maintenance Services and to Levy a Special Tax to Pay for Certain Maintenance Services Annexation 53
- 2019-139 Authorizing City Manager to Execute a Reimbursement Agreement with Jonathan Nguyen and Kristine Nguyen for Privately Constructed Public Facilities included in the Elk Grove Roadway Fee Program
- 2019-138 Authorizing City Manager to Execute the First Amendment to Consultant Contract with West Interactive Services for Website Hosting Services
August
- 2019-192 Amending the Fiscal Year 2019-2020 Budget for the City Clerk Budget for Demographer Consulting Services
- 2019-191 Declaring Its Intent To Transition to By-District (District Based) City Councilmember Elections Consistent with Elections Code Section 10010
- 2019-190 Determining to Levy Storm Water Drainage Fee Assessments for Certain Properties in the Laguna Ridge Area Which Represents Annexation No. 28 into Storm Water Drainage Fee Zone 2
- 2019-189 Declaring the Results of the Special Election held on August 28, 2019 and Ordering the Annexation of Territory to CFD 2006-1 Maintenance Services Annexation 53
- 2019-188 Calling a Special Election to Submit to the Qualified Electors the Question of Levying a Special Tax within the Area Proposed to be Annexed to CFD 2006-1 Maintenance Services Annexation 53
- 2019-187 Approving a Master License Agreement with New Cingular Wireless PCS
- 2019-186 Adopting a Facility Rental Fee Schedule for the Elk Grove Community Center, Civic Center Commons and Old Town Plaza
- 2019-185 Approving a Tentative Subdivision Map, Design Review for Subdivision Layout and Exception for The Heartstone Homes Project
- 2019-184 Approving Final Map for Madeira South Village 3B
- 2019-183 Approving Final Map for Madeira South Village 2B
- 2019-182 Approving Final Map for Madeira South Village 1B
- 2019-181 Approving Final Map for Fieldstone North Village 5
- 2019-180 Amending Fiscal Year 2019-2020 Budget for Various Strategic Planning Projects
- 2019-179 Authorizing City Manager to Execute a Contract with John F. Torti Architectural for the Kammerer Road Urban Design Study Project
- 2019-178 Authorizing City Manager to Execute a Construction Contract with Global Road Sealing for the FY20 Citywide Crack Seal Project
- 2019-177 Authorizing City Manager to Execute Third Amendment to Contract with Roebbelen Construction Management Services for Services related to the Aquatics/Commons and Community Center Projects
- 2019-176 Authorizing City Engineer to Reject all Bids Received for the Public Works-Public Infrastructure Maintenance (PIM) Project and Directing City Engineer to Re-Bid the Project
- 2019-175 Approving an Amendment to the Fiscal Year 2019-2020 Budget and 2019-2024 Capital Improvement Program for the Elk Grove Multi-Sport Park Complex Project
- 2019-174 Declaring Its Intention to Annex Territory to Storm Water Drainage Fee Zone 2 Annexation 29 and to Levy Storm Water Drainage Assessments
- 2019-173 Declaring Its Intention to Levy Street Maintenance Assessments Zone 5 Laguna Ridge Area Annexation 17
- 2019-172 Declaring Its Intention to Annex Territory to CFD 2006-1 Maintenance Services and To Levy a Special Tax to Pay for Certain Police Services Annexation 54
- 2019-171 Declaring Its Intention to Annex Territory to CFD 2003-2 Police Services and To Levy a Special Tax to Pay for Certain Police Services Annexation 48
- 2019-170 Authorizing City Manager to Execute a Second Amendment with Insurance Tracking Services for the Insurance Certificate Tracking Services
- 2019-169 Authorizing City Manager to Execute a Contract with LDV Custom Specialty Vehicles for the Purchase of a Police Mobile Command Vehicle
- 2019-168 Authorizing City Manager to Execute a Contract with Elk Grove Auto Group for the Purchase of Six Additional Light Duty Pickup Trucks for Public Works Operations & Maintenance Division
- 2019-167 Authorizing City Manager to Execute an Agreement with LC Action Police Supply for the One-Time Purchase of Firearms and Firearms Accessories for the EGPD
- 2019-166 Authorizing City Manager to Execute the Fourth Amendment with KP Research Services for Peace Officer Standards and Training (Post) Pre-Employment Background Investigations
- 2019-165 Approving the Issuance of Hospital Revenue Bonds by the California Public Finance Authority for the California Northstate Medical Center Campus Project Hospital to be Repaid by Northern California Health Services and Research Foundation
September
- 2019-215 Adopting the City of Elk Grove Flag Policy
- 2019-214 Approving Three MOU's with the CCSD concerning the Development of Park and Recreation Facilities, Landscape Trails and Park Maintenance, and Special Events
- 2019-213 Authorizing Use of the Bond Opportunities for Land Development (BOLD) Program, and Authorizing the California Municipal Finance Authority to Accept Applications from Property Owners, Conduct Proceedings and Levy Special Taxes within the Territory of the City Pursuant to the Mello-Roos Community Facilities ACT of 1982
- 2019-212 Approving the Fiscal Year 2018-19 Consolidated Annual Performance & Evaluation Report (CAPER)
- 2019-211 Finding no Further Environmental Review is Required Pursuant to State CEQA Guidelines Section 15183 and Approving Tentative Parcel Map for 8711 Bradshaw Road Project
- 2019-210 Ratifying the Agreement for Purchase and Sale and Joint Escrow Instructions for Property Located at 9362 Studio Court; Authorizing the Close of Escrow; and Amending the Fiscal Year 2019-20 Budget and 2019-24 CIP
- 2019-209 Amending the City of Elk Grove Land Secured Financing Policy and to Amend the City of Elk Grove Reimbursement Policies and Procedures for Privately-Constructed Facilities
- 2019-208 Authorizing City Manager to Execute the First Amendment to the Agreement for Advancement of Mitigation Funds and Reimbursement with WSI Poppy Ridge, LLC
- 2019-207 Authorizing City Manager to Execute a Contract with The National Research Center to Conduct The National Citizens/Community Survey
- 2019-206 Authorizing City Manager to Enter into a One Year Lease Agreement with Teen Center for Use of the City Facility at 8978 Elk Grove Blvd.
- 2019-205 Authorizing City Manager to Execute a Lease Agreement with Cafe Elk Grove to Operate the Cafe at the Elk Grove Community Center
- 2019-204 Authorizing City Manager to Execute a Contract with Artistic Holiday Designs for the Purchase of an Artificial Holiday Tree
- 2019-203 Authorizing City Manager to Execute Contracts for Employment Investigation Services with Ellis Makus LLP and Boutin Jones, Inc.
- 2019-202 Accepting the Structure Demolition Project 2018 as Complete
- 2019-201 Authorizing City Engineer to Approve Contract Change Orders for the Elk Grove Animal Shelter Project
- 2019-200 Accepting the Real Time Information Center Phase 2 Project as Complete
- 2019-199 Finding the 2020 Pavement Slurry Seal and Resurfacing Project Phase 1 and 2 Exempt from CEQA
- 2019-198 Authorizing City Manager to Execute Master Services Agreements with Unico Engineering, Vali Cooper & Associates, Knight CM Group, Psomas & Coastland Civil Engineering for On Call Construction Management Services
- 2019-197 Approving Final Map for the Milestone Subdivision
- 2019-196 Authorizing City Manager to Execute an Acquisition Agreement with Richmond American Homes for CFD 2005-1 Laguna Ridge from the Series 2018 Bonds
- 2019-195 Authorizing City Manager to Execute a Master Agreement with Ray Morgan Company for the Lease and Maintenance of Copiers
- 2019-194 Authorizing City Manager to Execute a Funding Agreement with Sacramento Metropolitan Cable Television Commission to Accept PEG Fee Funding
- 2019-193 Approving the Transfer of the Limited Partner Interests in the Agave Apartments Property Amtax Holdings 431, LLC and TCH II Pledge Pool, LLC to Vintage Housing Holdings, LLC
October
- 2019-245 Determining to Levy Storm Water Drainage Fee Assessments for Certain Properties in the Laguna Ridge Area which Represents Annexation 29 Zone 2
- 2019-244 Determining to Levy Street Maintenance Assessments in Street Maintenance District No. 1 Zone 5-N Laguna Ridge Area Annexation 17
- 2019-243 Declaring the Results of the Special Election Held on October 23, 2019, and Ordering the Annexation of Territory to CFD 2006-1 Maintenance Services Annexation 54
- 2019-242 Calling a Special Election to Submit to the Qualified Electors the Question of Levying a Special Tax within the Area Proposed to be Annexed to CFD 2006-1 Maintenance Services Annexation 54
- 2019-241 Declaring the Results of the Special Election Held on October 23, 2019, and Ordering the Annexation of Territory to CFD 2003-2 Police Services Annexation 48
- 2019-240 Calling a Special Election to Submit to the Qualified Electors the Question of Levying a Special Tax within the Area Proposed to be Annexed to CFD 2003-2 Police Services Annexation 48
- 2019-239 Approving the Issuance by the California Statewide Communities Development Authority of Multi-Family Housing Revenue Bonds for the Purpose of Financing or Refinancing the Acquisition, Construction, and Development of the Agave Apartments
- 2019-238 Authorizing City Manager to Apply for Grant Funding from the U.S. Department of Justice Drug Enforcement Administration to Implement a Strategic Enforcement Initiative as Part of the Organized Crime Drug Enforcement Task Force
- 2019-237 Authorizing City Manager to Accept Grant Funding for Concentrated Traffic Enforcement Strategies from the California Office of Traffic Safety
- 2019-236 Authorizing City Manager to Execute a First Amendment to the Contract with George Hills Company for Subrogation Services
- 2019-235 Dispensing with the Competitive Proposal Process Pursuant to EGMC Chapter 3.42 and Authorizing City Manager to Execute a Contract with Ralph Andersen & Assoc. for Executive Search and Services
- 2019-234 Authorizing the Addition of an Assistant Chief of Police and Adjusting the Chief of Police Salary Range
- 2019-233 Authorizing City Manager to Approve and Submit Applications to the State Department of Parks and Recreation's per Capita Grant Program
- 2019-232 Authorizing City Manager to Execute a License Agreement with Elk Grove Community Garden and Learning Center for the Use of City Owned Land as a Community Garden
- 2019-231 Approving the Transfer of Ownership of the Agave Apartments Property from Agave Associates to Agave by Vintage and Authorizing City Manager to Execute the Assignment and Assumption Agreement with Agave Associates and Agave by Vintage
- 2019-230 Authorizing City Manager to Enter into a Lease Agreement with the Senior Center
- 2019-229 Authorizing City Manager to Execute Amendment to the Credit Reimbursement Agreement with Taylor Morrison for Privately Constructed Public Facilities for Madeira East Village 8 included in the Elk Grove Roadway Fee Program
- 2019-228 Declaring Its Intention to Annex Territory to Storm Water Drainage Fee Zone 2 Annexation 30
- 2019-227 Declaring Its Intention to Levy Street Maintenance Assessments Zone 3-Z Eastern Area Annexation 37
- 2019-226 Declaring Its Intention to Annex Territory to CFD 2006-1 Maintenance Services and to Levy a Special Tax to Pay for Certain Maintenance Services Annexation 55
- 2019-225 Declaring Its Intention to Annex Territory to CFD 2003-2 Police Services and to Levy a Special Tax to Pay for Certain Police Services Annexation 49
- 2019-224 Authorizing City Manager to Execute the First Amendment with Associated Right of Way Services and First Amendment with Integra Realty Resources for On Call Appraisal Services
- 2019-223 Authorizing City Manager to Execute the First Amendment with Interwest Consulting Group for the Development Services Department
- 2019-222 Ratifying the Agreement for Purchase and Sale and Joint Escrow Instructions and the First Amendment to the Agreement for Purchase and Sale and Joint Escrow Instructions for Property Located at Bruceville Road and Big Horn Blvd
- 2019-221 Approving the First Amendment to the Purchase and Sale Agreement and Joint Escrow Instructions for Property Located at 9676 Railroad Street
- 2019-220 Authorizing an Increase to the Change Order Authority for the Bond Road Pavement Rehabilitation Project
- 2019-219 Authorizing City Engineer to Reject All Bids Received for the 2020 Pavement Slurry Seal & Resurfacing Project Phase 1
- 2019-218 Authorizing City Manager to Execute a Maintenance Contract with MCE Corporation for the Public Works - Public Infrastructure Maintenance Project
- 2019-217 Authorizing City Manager to Execute Billing Agreement for Small Cell Connection to City Streetlights with SMUD
- 2019-216 Authorizing City Manager to Execute Second Amendment to Contract with Willdan Engineering for the Development Services Department
November
- 2019-263 Fixing the Time, Place and Frequency for Regular Meetings of The City Council
- 2019-262 Appointing Lyndon Hawkins to a Four Year Term as the City of Elk Grove Member Representative on the Sacramento Yolo Mosquito & Vector Control District's Board of Trustees
- 2019-261 Amending the Fiscal Year 2019-2020 Budget and Fiscal Years 2019-2024 CIP
- 2019-260 Repealing Resolution 2017-289, and Approving Policy Associated with Title 30 (Chapters 30.50, 30.60, 30.70, and 30.90) of the EGMC Titled Solid Waste Management related to the Methodology used to Determine Commercial Hauler Fees
- 2019-259 Approving Minor Conditional Use Permit and Determination of Public Convenience or Necessity for the Bank Shot Project located at 8535 Elk Grove Blvd
- 2019-258 Authorizing City Manager to Execute an Agreement with WEAVE for a Domestic Violence Response Team
- 2019-257 Authorizing City Manager to Accept an Appropriation from the State Supplemental Law Enforcement Services Fund
- 2019-256 Authorizing City Manager to Execute the Eighth Amendment with Cordico Psychological Corporation for Specialized Law Enforcement Psychological and Wellness Services
- 2019-255 Authorizing City Manager to Execute Master Services Contracts with Bennett Engineering Services; Dewberry Engineers; Dokken Engineering; Psomas; and Quincy Engineering for On Call Architectural/Engineering Services
- 2019-254 Authorizing City Manager to Execute a Maintenance Contract with Bear Electrical Solutions for the Traffic Signal and Street Light Maintenance Project
- 2019-253 Accepting Various Capital Projects and Minor Public Works Projects or Studies as Complete or Closed
- 2019-252 Amending the Fiscal Year 2019-20 Budget by $297,093 for the Whitelock Parkway Pedestrian Signal Project and Authorizing City Manager to Execute Equipment Purchases with Multiple Vendors
- 2019-251 Amending the Fiscal Year 2019-20 Budget by $80,000 for the 8401 Laguna Palms Way Wellness Room Project
- 2019-250 Approving a Minor Update to the City of Elk Grove Storm Drainage Master Plan
- 2019-249 Rescinding Resolution 2019-145 and Approving the Senate Bill 1 State of Good Repair Project List for the FY 2019-20 Funding Allocation
- 2019-248 Authorizing City Manager to Execute a Credit Reimbursement Agreement with Taylor Morrison for Privately Constructed Public Facilities included in the Elk Grove Roadway Fee Program
- 2019-247 Authorizing Execution and Delivery of Joint Community Facilities Agreements in Connection with the Bond Opportunities for Land Development (BOLD) Program
- 2019-246 Approving the Annual Development Impact Fee Report for Fiscal Year 2018-19
December
- 2019-287 Determining to Levy Storm Water Drainage Fee Assessments for Certain Properties in the Laguna Ridge Area Annexation 30 Zone 2
- 2019-286 Determining to Levy Street Maintenance Assessments in Street Maintenance District 1 Zone 3-Z Eastern Area Annexation 37
- 2019-285 Declaring the Results of the Special Election Held on December 11, 2019 and Ordering the Annexation of Territory to CFD 2006-1 Maintenance Services Annexation 55
- 2019-284 Calling a Special Election to Submit to the Qualified Electors the Question of Levying a Special Tax within the Area Proposed to be Annexed to CFD 2006-1 Maintenance Services Annexation 55
- 2019-283 Declaring the Results of the Special Election Held on December 11, 2019 and Ordering the Annexation of Territory to CFD 2003-2 Police Services Annexation 49
- 2019-282 Calling a Special Election to Submit to the Qualified Electors the Question of Levying a Special Tax within the Area Proposed to be Annexed to CFD 2003-2 Police Services Annexation 49
- 2019-281 Adopting the Amendments to the Laguna Ridge Specific Plan
- 2019-280 Adopting the Proposed Amendments to the Rural Roads Policy and Rural Roads Improvement Standards
- 2019-279 Adopting Amendment to The Transportation Analysis Guidelines
- 2019-278 Approving an Amendment to the Climate Action Plan Measure BE-7 to be Consistent with 2019 California Building Codes
- 2019-277 Adopting Amendment to the Elk Grove General Plan
- 2019-276 Approving a Master License Agreement with Verizon Wireless
- 2019-275 Authorizing City Manager to Execute Contract with Profit Systems to Provide EventPro Facility Reservation Software
- 2019-274 Authorizing City Manager to Execute a Contract with GHD for City of Elk Grove Bicycle, Pedestrian and Trails Master Plan Update
- 2019-273 Authorizing City Manager to Execute a Contract for Services with Visit Elk Grove
- 2019-272 Accepting Asphalt Concrete Repairs in Preparation for WPR019 as Complete
- 2019-271 Authorizing City Manager to Execute First Amendment of Lease Agreement with Teen Center
- 2019-270 Authorizing City Manager to Execute Loan Documents, Necessary to Make Loan to The Gardens at Quail Run Apartments Project
- 2019-269 Setting Aside a Portion of City Owned Property to be Used for Public Utility and Public Facilities Purposes
- 2019-268 Approving Final Map for Sheldon Terrace Phase 2 Subdivision and Authorizing City Manager to Execute Subdivision Improvement Agreement
- 2019-267 Authorizing City Manager to Execute All Documents Necessary to Transfer the Title of Land for Kammerer Family Park from the City to the CCSD
- 2019-266 Ratifying the Fire Code Adopted by CCSD
- 2019-265 Declaring Its Intention to Annex Territory to CFD 2006-1 Maintenance Services and to Levy a Special Tax to Pay for Certain Maintenance Services Annexation 56
- 2019-264 Approving an Agreement for Deferral of Certain Impact Fees with Elk Grove Pacific Associates IV for The Gardens at Quail Run Project